×







We sell 100% Genuine & New Books only!

BIM Handbook A Guide to Building Information Modeling for Owners Managers Designers Engineers and Contractors 2008 Edition at Meripustak

BIM Handbook A Guide to Building Information Modeling for Owners Managers Designers Engineers and Contractors 2008 Edition by Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston , John Wiley

Books from same Author: Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston

Books from same Publisher: John Wiley

Related Category: Author List / Publisher List


  • Price: ₹ 7336.00/- [ 13.00% off ]

    Seller Price: ₹ 6382.00

Estimated Delivery Time : 4-5 Business Days

Sold By: Meripustak      Click for Bulk Order

Free Shipping (for orders above ₹ 499) *T&C apply.

In Stock

We deliver across all postal codes in India

Orders Outside India


Add To Cart


Outside India Order Estimated Delivery Time
7-10 Business Days


  • We Deliver Across 100+ Countries

  • MeriPustak’s Books are 100% New & Original
  • General Information  
    Author(s)Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston
    PublisherJohn Wiley
    ISBN9780470185285
    Pages504
    BindingHardback
    LanguageEnglish
    Publish YearMay 2008

    Description

    John Wiley BIM Handbook A Guide to Building Information Modeling for Owners Managers Designers Engineers and Contractors 2008 Edition by Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston

    Discover BIM: A better way to build better buildings. Building Information Modeling (BIM) is a new approach to design, construction, and facility management in which a digital representation of the building process is used to facilitate the exchange and interoperability of information in digital format. BIM is beginning to change the way buildings look, the way they function, and the ways in which they are designed and built. BIM Handbook: A Guide to Building Information Modeling for Owners,Managers, Designers, Engineers, and Contractors provides an in-depth understanding of BIM technologies, the business and organizational issues associated with its implementation, and the profound advantages that effective use of BIM can provide to all members of a project team.The Handbook: * Introduces Building Information Modeling and the technologies that support it * Reviews BIM and its related technologies, in particular parametric and object-oriented modeling, its potential benefits, its costs, and needed infrastructure * Explains how designing, constructing, and operating buildings with BIM differs from pursuing the same activities in the traditional way using drawings, whether paper or electronic * Discusses the present and future influences of BIM on regulatory agencies; legal practice associated with the building industry; and manufacturers of building products * Presents a rich set of BIM case studies and describes various BIM tools and technologies * Shows how specific disciplines - owners, designers, contractors, and fabricators - can adopt and implement BIM in their companies * Explores BIM's current and future impact on industry and society Painting a colorful and thorough picture of the state of the art in Building Information Modeling, the BIM Handbook guides readers to successful implementations, helping them to avoid needless frustration and costs and take full advantage of this paradigm-shifting approach to build better buildings, that consume fewer materials, and require less time, labor, and capital resources. Table of contents :- Preface. CHAPTER 1: BIM HANDBOOK INTRODUCTION. 1.1 Introduction. 1.2 The Current AEC Business Model. 1.3 Documented Inefficiencies of Traditional Approaches. 1.4 BIM: New Tools and New Processes. 1.5 What Is Not BIM Technology. 1.6 What Are the Benefits of BIM, What Problems Does It Address?. 1.7 What Challenges Can Be Expected?. 1.8 Future of Designing and Building with BIM (Chapter 8). 1.9 Case Studies (Chapter 9). CHAPTER 2: BIM TOOLS AND PARAMETRIC MODELING. 2.0 Executive Summary. 2.1 History of BIM Technology. 2.2 Varied Capabilities of Parametric Modelers. 2.3 Overview of the Major BIM model generating systems. 2.4 Conclusion. CHAPTER 3: INTEROPERABILITY. 3.0 Executive Summary. 3.1 Introduction. 3.2 Different Kinds of Exchange Formats. 3.3 Background of Product Data Models. 3.3.1 IFC Relation to STEP. 3.3.2 Organization of IAI. 3.3.3 What Are the IFCs?. 3.3.4 IFC Coverage. 3.3.5 IFC in Use. 3.3.6 Implications of IFC Use. 3.3.7 The Future of IFC. 3.4 XML Schemas. 3.5 Portable, Web-Based Formats: DWF and PDF. 3.6 File Exchange Versus Building Model Repositories. 3.7 Summary. CHAPTER 4: BIM FOR OWNERS AND FACILITY MANAGERS. 4.0 Executive Summary. 4.1 Introduction: Why Should Owners Care About BIM?. 4.2 BIM Application Areas for Owners. 4.2.1 Cost Reliability and Management. 4.2.2 Time to Market: Schedule Management. 4.2.3 Complexity of Building Infrastructure and Building Environment. 4.2.4 Sustainability. 4.2.5 Overcoming Labor Shortage, Education, and Language Barriers. 4.2.6 Design Assessment. 4.2.7 Facility and Information Asset Management. 4.3 Types of Owners: Why, How Often, and Where They Build. 4.3.1 The BIM Business Case. 4.3.2 Operating Owners vs. Developer Owners. 4.3.3 When Owners Build: One-Time or Serial. 4.4 How Owners Build. 4.4.1 Single Stage, Traditional, or Design-Bid-Build. 4.4.2 Design-Build. 4.4.3 Collaborative Process. 4.4.4 Internal or External Modeling. 4.5 BIM Tool Guide for Owners. 4.5.1 BIM Estimating Tools. 4.5.2 Model Validation, Program, and Code Compliance. 4.5.3 Project Communication and Model Review Tools. 4.5.4 Model Viewing and Review. 4.5.5 Model Servers. 4.5.6 Facility and Asset Management Tools. 4.5.7 Operation Simulation Tools. 4.6 An Owner and Facility Manager's Building Model. 4.7 Leading the BIM Implementation on a Project. 4.7.1 Build Internal Leadership and Knowledge. 4.7.2 Service Provider Selection. 4.7.3 Build and Educate a Qualified Network of BIM Service Providers. 4.7.4 Change Deliverable Requirements: Modify Contracts and Contract Language. 4.8 Barriers to Implementing BIM: Risks and Common Myths. 4.8.1 Process Barriers. 4.8.2 Technology Risks and Barriers. 4.9 Guidelines and Issues for Owners to Consider When Adopting BIM. CHAPTER 5: BIM FOR ARCHITECTS AND ENGINEERS. 5.0 Executive Summary. 5.1 Introduction. 5.2 Scope of Design Services. 5.2.1 The Concept of Information Development. 5.2.2 Technical Collaborations. 5.3 BIM Use in Design Processes. 5.3.1 Concept Design and Preliminary Analyses. 5.3.2 Building System Design and Analysis/Simulation. 5.3.3 Construction-Level Building Models. 5.3.4 Design-Construction Integration. 5.3.5 Design Review. 5.4 Building Element Models and Libraries. 5.4.1 Object Libraries. 5.4.2 Portals. 5.4.3 Desktop/LAN Libraries. 5.4 Considerations in Adoption for Design Practice. 5.5.1 BIM Justification. 5.5.2 Training and Deployment. 5.5.3 Phased Utilization. 5.6 New and Changed Staffing within Design Firms. 5.7 New Contractual Opportunities in Design. CHAPTER 6: BIM FOR THE CONSTRUCTION INDUSTRY. 6.0 Executive Summary. 6.1 Introduction. 6.2 Types of Construction Firms. 6.3 Information Contractors Want from BIM. 6.4 Processes to Develop a Contractor Building Information Model. 6.5 Reduction of Design Errors Using Clash Detection. 6.6 Quantity Takeoff and Cost Estimating. 6.6.1 Export Quantities to Estimating Software. 6.6.2 Directly Link Bim Components to Estimating Software. 6.6.3 Quantity Takeoff Tool. 6.6.4 Guidelines and BIM Implementation Issues to Support Quantity Takeoff and Estimating. 6.7 Construction Analysis and Planning. 6.7.1 4D models to support construction planning. 6.7.2 Benefits of 4D Models. 6.7.3 4D Modeling Processes. 6.7.4 BIM-Supported Planning and Scheduling Issues and Guidelines. 6.8 Integration with Cost and Schedule Control and Other Management Functions. 6.9 Use for Offsite Fabrication. 6.10 Use of BIM Onsite: Verification, Guidance, and Tracking of Construction Activities. 6.11 Implications for Contract and Organizational Changes. 6.12 BIM Implementation. CHAPTER 7: BIM FOR SUBCONTRACTORS AND FABRICATORS. 7.0 Executive Summary. 7.1 Introduction. 7.2 Types of Subcontractors and Fabricators. 7.2.1 Engineered-To-Order (ETO) Component Producers. 7.2.2 Design Service Providers. 7.2.3 Specialist Coordinators. 7.3 The Benefits of a BIM Process for Subcontractor Fabricators. 7.3.1 Marketing and Tendering. 7.3.2 Reduced Production Cycle-Times. 7.3.3 Reduced Design Coordination Errors. 7.3.4 Lower Engineering and Detailing Costs. 7.3.5 Increased Use of Automated Manufacturing Technologies. 7.3.6 Increased Pre-Assembly and Prefabrication. 7.3.7 Quality Control, Supply Chain Management, and Life-Cycle Maintenance. 7.4 BIM-Enabled Process Change. 7.4.1 Leaner Construction. 7.4.2 Less Paper in Construction. 7.4.3 Increased Distribution of Work. 7.5 Generic BIM System Requirements for Fabricators. 7.5.1 Parametric and Customizable Parts and Relationships. 7.5.2 Reporting Components for Fabrication. 7.5.3 Interface to Management Information Systems. 7.5.4 Interoperability. 7.5.5 Information Visualization. 7.5.6 Automation of Fabrication Tasks. 7.6 Major Classes of Fabricators and Their Specific Needs. 7.6.1 Structural Steel. 7.6.2 Precast Concrete. 7.6.3 Cast-In-Place (CIP) Reinforced Concrete. 7.6.4 Curtain Walls and Fenestration. 7.6.5 Mechanical, Electrical and Plumbing (MEP). 7.7 Adopting BIM in a Fabrication Operation. 7.7.1 Setting Appropriate Goals. 7.7.2 Adoption Activities. 7.7.3 Planning the Pace of Change. 7.7.4 Human Resource Considerations. 7.8 Conclusions. CHAPTER 8: THE FUTURE: BUILDING WITH BIM. 8.0 Executive Summary. 8.1 Introduction. 8.2 The Development of BIM Up To 2007. 8.3 Current Trends. 8.4 Vision 2012. 8.4.1 Impact on the Design Professions: Shifting Services and Roles. 8.4.2 Impact On Owners: Better Options, Better Reliability. 8.4.3 Impact on Construction Companies: BIM at the Construction Site. 8.4.4 Impact on Construction Contracting: Closer Collaborations Among Designers and Contractors. 8.4.5 Impact on Construction Education: Integrated Education. 8.4.6 Impact on Statutory Authorities: Planting the Seeds of Online Access and Review. 8.4.7 Impact on Project Documentation: On-Demand Drawings. 8.4.8 Impact on BIM Tools: More Integration, More Specialization, More Information. 8.4.9 Impact on Research: Model Analysis, Simulation, and Work Processes. 8.4.10 Vision 2012: The Limitations. 8.5 Drivers of Change and BIM Impacts up to 2020. 8.5.1 Economic, Technological, and Societal Drivers. 8.5.2 Obstacles to Change. 8.5.3 Development of BIM Tools. 8.5.4 Role of Drawings. 8.5.5 Design Professions: Providing New Services. 8.5.6 Integrated Design/Build Services and Agreements. 8.5.7 Building Product Manufacturers: Intelligent Product Specs. 8.5.8 Construction Regulation: Automated Code-Checking. 8.5.9 Lean Construction and BIM. 8.5.10 Construction Companies: Information Integration. 8.5.11 BIM Skills and Employment: New Roles. CHAPTER 9: BIM CASE STUDIES. 9.1 Flint Global V6 Engine Plant Expansion. 9.1.1 The Project. 9.1.2 The Project Team. 9.1.3 The Design Process. 9.1.4 The Construction Process. 9.1.5 The Operation. 9.1.6 Conclusion. Case Study 9.2: United States Coast Guard BIM Implementation. 9.2.1 Introduction. 9.2.2 BIM for Facility Assessment and Planning. 9.2.3 BIM for Scenario Planning. 9.2.4 OCCSU System. 9.2.5 Conclusion. 9.3 Camino Medical Group Mountain View Medical Office Building Complex. 9.3.1 Description of Project. 9.3.2 General Description of Project Management Techniques. 9.3.3 General Contractor (GC). 9.3.4 Owner. 9.3.5 General Contractor (GC). 9.3.6 Architect. 9.3.7 Electrical Subcontractor. 9.3.8 Lessons Learned. 9.3.9 Conclusion. 9.4 Beijing National Aquatics Center. 9.4.1 Introduction. 9.4.2 Structural Concept. 9.4.3 BIM in Design and Construction. 9.4.4 Lessons Learned. 9.4.5 Conclusion. 9.5: San Francisco Federal Building. 9.5.1 Introduction. 9.5.2 Description of Building Program. 9.5.3 Participants. 9.5.4 Fresh Air and Natural Ventilation. 9.5.5 Uses of BIM Tools. 9.5.6 Use of Building Modeling Tools for Architectural Development. 9.5.7 How the Design Was Affected by Natural Ventilation. 9.5.8 Conclusion. 9.6 100 11th Avenue, New York City. 9.6.1 Introduction. 9.6.2 BIM Process: Innovation and Challenges. 9.6.3 Information Exchange and Interoperability. 9.6.4 Lessons Learned. 9.6.5 Conclusion. 9.7 Case Study of One Island East Project. 9.7.1 Introduction. 9.7.2 Pre-Tender Stage BIM Implementation Process. 9.7.3 Post-Tender Stage BIM Implementation Process. 9.7.4 Conclusion. 9.8 Penn National Parking Structure. 9.8.1 Introduction. 9.8.2 Conceptual Design. 9.8.3 Design Development and Analysis. 9.8.4 Detailing for Fabrication. 9.8.5 Conclusion. 9.9 Hillwood Commercial Project. 9.9.1 Description of Project. 9.9.2 Description of Conceptual Estimating Process. 9.9.3 Overview of BIM Technology to Support Conceptual Estimating. 9.9.4 Overview of the BIM Estimating Process. 9.9.5 Design Alternatives That Were Evaluated. 9.9.7 Benefits Realized. 9.9.8 Conclusion. 9.10 U.S. Courthouse, Jackson, Mississippi. 9.10. 1 H3 Hardy Collaboration Architecture LLC and the Jackson Mississippi Courthouse. 9.10.2 Virtual Reality Use in Courtroom Design. 9.10.3 Exploratory Application of the GSA BIM Program. 9.10.4 BIM Design Integration. 9.10.5 Integrating Cost Estimation with BIM. 9.10.6 Design Guide Validation. 9.10.7 Conclusion. Glossary. Bibliography. Index.show more



    Book Successfully Added To Your Cart